Azrar Copper-Silver Project, Morocco
A JV-funded copper-silver drill target in Morocco’s Western Anti-Atlas.
Aterian holds 85% of the 76.9 km² Azrar copper-silver project in Morocco’s Western Anti-Atlas, with Lithosquare holding 15%. An 800 m scout RC drilling programme, fully funded through the joint venture, is set to test a priority copper-silver target.
Read the latest announcementsAzrar Project at a glance
Information as at
- Copper showings identified over an apparent 1.60 km strike length, from mapping of 4 of 22 planned traverses
- Remainder of the Amane Target length
85%
Aterian interest. Lithosquare SAS holds the remaining 15%.
76.9 km²
Project area in Morocco’s Western Anti-Atlas.
800 m
Scout RC drilling programme, fully funded through the joint venture.
up to 7 m
Apparent thickness of mineralised exposures at Amane West.
- Location
- Approximately 155 km southeast of Agadir and approximately 45 km east of Managem Group’s Tizert copper-silver project. Mineralisation at Tizert is not necessarily indicative of mineralisation at Azrar.
- 2026 fieldwork
- Mapping of approximately 22 traverses (8.20 line km), access improvements, detailed mapping and a topographic survey over an initial Amane drill target, and hyperspectral data acquisition.
- Historic sampling
- Up to 3.41% Cu and 56 g/t Ag from historic composite point rock chip samples.
- Drilling
- 800 m scout reverse circulation (RC) programme, announced on 4 November 2026 as set to commence imminently. Drill rig mobilised to site.
- Funding
- Fully funded through Aterian’s AI joint venture with Lithosquare SAS.
- Stage
- Exploration. The continuity and full extent of the mineralisation remain to be determined.
Source: Aterian plc announcements of 14 October 2026 and 4 November 2026. Read the announcements
Q4 2026 exploration programme
The JV combines Lithosquare’s AI and geoscience capabilities with Aterian’s project portfolio and operational expertise.
Status as at
-
Fieldwork under way at Amane
Initial mapping of 4 of 22 planned traverses has identified copper showings over an apparent 1.60 km strike length within the now 2.50 km long Amane Target.
New stratabound copper showings have been identified, with mineralised exposures having apparent thicknesses ranging from up to approximately 7 m at Amane West and 2 m at Amane North.
-
Drill rig mobilised to site
Access upgrades and drill pad preparation are progressing ahead of subsurface testing. An 800 m scout reverse circulation (RC) drilling programme, fully funded through the joint venture, is set to commence imminently.
The priority target comprises an approximately 1 km-long mineralised fault zone and surrounding prospective sediments.
-
To follow
Drilling and results
The programme will test the continuity and subsurface extent of surface mineralisation and provide data to guide the next phase of exploration.
Scout drilling objectives
The planned RC drilling totalling 800 m is focussed on achieving several objectives:
- To intersect mineralisation of a suitable grade and width to be deemed as showing economic potential.
- To understand the continuity of the copper-silver mineralisation mapped and sampled at surface within the fault and the immediately surrounding Adoudou Formation sediments.
- To identify the subsurface extent and continuity of gossanous material observed on surface, both within the fault and fault-proximal bedding-parallel outcrops.
- To provide geological and geochemical datasets to support interpretation and prioritise additional target areas.
Source: Aterian plc announcements of 14 October 2026 and 4 November 2026. Read the announcements
Field results: Amane and Tifrit
New mapping has substantially expanded the known footprint of previously discovered mineralisation at the Amane Target. To the north, initial results indicate a strike length potential of 1.00 to 1.20 km; to the west, they indicate an approximate strike length potential of 0.25 km. Apparent thicknesses vary from approximately 1.00 m to 7.00 m, with potential for stacked, cyclical repetitions of mineralisation. The along-strike continuity and extent of the mineralisation remain to be determined.
Historic workings associated with visible copper mineralisation have been identified.
| Target | Observation |
|---|---|
| Amane Target (North) | Up to ~2 m apparent thickness of mineralised sediments with potential for multiple stacked mineralised beds. |
| Amane Target (West) historic working | ~7 m apparent thickness of mineralised sediments. Stratabound mineralisation target. |
| Amane Target (East) historic working | Fault target. Previous assay results up to 3.41 % Cu & 56 g/t Ag. |
| Tifrit Target | Up to ~3 m thick mineralised sediments traced locally over ~50 m strike length. Previously undiscovered stratabound copper mineralisation has been identified within basal conglomerate and fine-grained sandstone beds of the Lower Adoudou Formation. The mineralisation occurs over apparent widths of 3.00 m and has been traced laterally over 50 m. |
Field photographs
-
Tifrit Target Disseminated malachite in sandstone -
Amane Target Historic infilled working -
Amane Target Disseminated sulphides in arkosic sandstone -
Amane Target Disseminated and vug coating malachite -
Access works underway -
Access works underway
The Project will undertake detailed mapping and systematic sampling over priority targets.
Geological setting and location
Where the mineralisation occurs
Mineralisation occurs in two geological settings.
Upper Adoudou Formation
Silica-rich and siltstone-rich beds within the massive dark-grey dolomite of the basal dolomitic sediments (Tamjout dolomite).
Lower Adoudou Formation
Gently dipping sandstone-conglomerate beds.
The copper mineralisation is characterised by copper carbonate minerals, notably malachite, and minor primary sulphides.
Location and district context
The Azrar project lies approximately 45 km east of Managem Group’s Tizert copper-silver project. Mineralisation at Tizert is not necessarily indicative of mineralisation at Azrar.
The presence of neighbouring deposits underscores the district-scale prospectivity of the Anti-Atlas Belt, although mineralisation at those deposits is not necessarily indicative of mineralisation at Agdz and Azrar.
Source: Aterian plc announcements of 14 October 2026 and 4 November 2026. Read the announcements
Earlier results (2024)
Reported highlights, Q4 2024
These results were reported in Q4 2024 and predate the 2026 exploration programme.
Azrar Project – Five priority targets covering a cumulative 11.4 km² area.
| Target | Reported result |
|---|---|
| Tifrit copper-gold target | 0.82 g/t Au and 0.63 % Cu over 9.0 m from surface chip channel targeting northerly strike quartz veins, including: 0.70 g/t Au and 0.55 % Cu over 7.6 m from 0 to 7.6 m along the channel, and 2.97 g/t Au and 2.00 % Cu over a 0.7 m interval from 8.3 m to 9.0 m. These results and previously announced samples (per the announcement of 31 January 2024) indicate this gold-copper target zone’s potential strike length to be 3.8 km. |
| Ougri sedimentary-hosted copper target | Up to 2.92 % Cu and 16 g/t Ag from rock chip samples over an 800 m strike length of a 1.4 km basal Adoudou Formation target. |
| Izarzar fault zone hosted copper target | Up to 1.37 % Cu and 6 g/t Ag from a variably mineralised fault zone with an apparent width of up to 13.25 m within folded Adoudou Formation sediments. |
Airborne geophysics
The Company acquired line data, in 2024, covering over 250 km² from historical airborne geophysical surveys flown over the Tata and Azrar Projects from the Ministry of Energy, Transition and Sustainable Development in Rabat, Morocco. The surveys were flown in 1998-1999 by Geoterrex Dighem Pty., collecting magnetometry, gamma-spectrometry, and multi-frequency electromagnetic data. This data has been reprocessed and reinterpreted as part of an ongoing target generation exercise over the projects.
-
Historic regional airborne survey lines. -
Airborne geophysical targets and geological interpretation. -
Sedimentary-hosted copper at Azrar.
More projects in Morocco
Primarily targeting Copper – Silver, in addition to Au, Sn, Zn & Pb
Projects are located mainly in the Anti-Atlas Mountains, as well as the High Atlas and Central Morocco.
The Anti-Atlas is highly prospective for sedimentary-hosted copper.
- Tata Project Up to 7.02 % Cu from sediments, over 32 km of mineralised strike
- Jebilet Est Project Up to 4.43 % Cu from quartz-carbonate vein swarm
- Agdz Project Drilling and trenching confirmed copper-silver mineralisation associated with structurally controlled systems.
Each project page carries the full reported results.
Stay Informed
Don't miss the next update
The pace of activity is increasing across Morocco, Rwanda and Botswana. Sign up to get exploration and trading updates as they happen.